Concluding steps
▶
"Installing the fan cage" on page
77.
▶
"Reassembling" on page 59.
▶
"Connecting the power cord" on page 65.
▶
"Switching on the server" on page 71.
▶
If applicable, "Installing the front cover with lock" on page 71.
▶
"Setting boot priority" on page 120.
▶
Check the settings of the ODD in the BIOS and iRMC S6 web interface.
▶
"Resuming BitLocker functionality" on page 107.
13.4 LTO drive
13.4.1 Installing the LTO drive
Upgrade and Repair Unit
(URU)
Hardware: 10 minutes
Tools: Phillips PH2 / (+) No. 2 screwdriver
Preliminary steps
▶
"Suspending BitLocker functionality" on page
89.
▶
If applicable, "Removing the front cover with lock" on page 49.
▶
"Shutting down the server" on page 50.
▶
"Disconnecting the power cord" on page 50.
▶
"Getting access to the component" on page 55.
▶
"Removing the fan cage" on page 76.
Accessible drives
420 Upgrade and Maintenance Manual RX2540 M7