EasyManua.ls Logo

Fujitsu PRIMERGY RX2540 M7

Fujitsu PRIMERGY RX2540 M7
646 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Concluding steps
"Installing the crossbar" on page
84.
"Installing the fan cage" on page 77.
"Installing the air duct" on page 79.
Install all riser modules, see "Installing a riser module" on page 74.
"Reassembling" on page 59.
If applicable, install the OCP module, see "Installing an OCP module" on
page 262.
Install all PSUs, see "Installing a hot-plug PSU" on page 126.
"Connecting the power cord" on page 65.
"Switching on the server" on page 71.
If applicable, "Installing the front cover with lock" on page 71.
17.4.5 Replacing the TPM
Field Replaceable Unit
(FRU)
Hardware: 35 minutes
System board and components
RX2540 M7 Upgrade and Maintenance Manual 501

Table of Contents

Related product manuals