EasyManuals Logo

GE LOGIQ P9 Service Manual

GE LOGIQ P9
602 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #96 background imageLoading...
Page #96 background image
GERAFT LOGIQ P9/P7
D
IRECTION 5604324, REVISION 11 DRAFT (JANUARY 24, 2019) SERVICE MANUAL
3-28 Section 3-7 - Completing the Set Up
3) Select the SHUTDOWN button. The system performs an automatic full shutdown sequence.
4) Switch OFF the Circuit at the rear of the system.
NOTE: The mains outlet of the system for peripheral auxiliary equipment are commonly switched with the
ON/OFF button. So the auxiliary equipment need not to be switched ON/OFF separately.
WARNINGWARNING
!! WARNING:
Disconnection of the Main Power Cable is necessary!
For Example: When repairing the system.

Table of Contents

Other manuals for GE LOGIQ P9

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ P9 and is the answer not in the manual?

GE LOGIQ P9 Specifications

General IconGeneral
TypeUltrasound System
3D/4D ImagingYes
ElastographyYes
ConnectivityDICOM, USB, Ethernet, HDMI
Doppler ModesColor Doppler, Power Doppler
Probesconvex, linear, phased array
Imaging ModesM-Mode, Color Doppler, Power Doppler
PortabilityCart-based
ApplicationsVascular, Cardiac, OB/GYN, Musculoskeletal
WeightApprox. 80 kg
Touch Panel10.1-in touchscreen

Related product manuals