EasyManua.ls Logo

IAI TB-02 - 3.12 Test run

Default Icon
420 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Operation of CON Related Controllers
84
(3) Direct move
Input the target position and the speed on the numeric keys to perform movement.
Refer to [3.12.3 Direct Movement Operation] for details about how to operate.
(4) I/O test
Monitoring of the PIO input signals and compulsory output of the output signals can be
conducted.
Refer to [3.12.4 I/O test] for details about how to operate.

Table of Contents

Other manuals for IAI TB-02