PROPULSION / ENGINE 16-21
CHANGE C2 ICON A5 / MAINTENANCE MANUAL
30. Set the engine into a Rotax 912 iS shipping pallet or other suitable surface and remove the hoist
tool.
31. Bag and label all loose parts and cover and protect the engine.
VERIFICATION METHOD:
Verify security of engine (Rotax 912 iS) on shipping pallet. check that disconnected electrical cables
are properly isolated and check that disconnected fluid connections are secured and not leaking.
RELATED INFORMATION:
"Install Engine" on page 16-21
"Engine Oil Check and Replenish" on page 16-77
"Remove Engine Cowlings" on page 16-13
"A5 Specific Oil Change Procedures" on page 16-78
"Engine Coolant Replacement" on page 16-57
"Engine Mount Removal" on page 16-27
"Install Engine Cowlings" on page 16-16
"Remove Oil Tank" on page 16-72
"Install Oil Tank" on page 16-76
16.1.4.4 Install Engine
Use the following procedure to install the Rotax 912iS into the aircraft.
TASK INFORMATION:
Type of Maintenance
Heavy
Level of Certification
LSA-RM
Task Specific Training Required
No
Special Tools Required
ITL-902 (ENGINE HOIST END EFFECTOR)
Parts Required
None
Aircraft System and Number
13—Propulsion
Consumables
ICA012078 (LUBRICANT, GENERAL PURPOSE) Tef-Gel
®
DEX-COOL 50-50 (COOLANT, ENGINE)