EasyManua.ls Logo

Krone MX 310 GL - 11 Operation; Preparations for the Loading Process

Krone MX 310 GL
244 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
150
Pos: 25.1 /Übersc hriften/Übersc hriften 1/A-E/B edienung @ 0 \mod_119978 9505403_78.doc @ 34825
11 Operation
Pos: 25.2 /BA/Be dienung /La dewagen/Lade/ Entladevorgang/V orbereiten des Ladevorgang s @ 0\mod_1 19978936749 7_78.doc @ 348 44
11.1 Preparations for the Loading Process
Set the desired number of blades and the chop length as well: see section on Settings
"Cutting System".
Setting for pick-up working height: see Section on Settings "Pick-up".
Default setting for roller crop guide: see section on Settings "Roller Crop Guide".
Pos: 25.3 /BA/Be dienung /La dewagen/Lade/ Entladevorgang/V orbereiten d es Ladevorgangs Hi nweis @ 1\ mod_120178 8295639_78.doc @ 54501
Note
The swath should be uniform and loose.
Pos: 25.4 /BA/---- -Seitenumbruch-- ---- @ 0\ mod_1196175311 226_0.doc @ 4165

Table of Contents

Related product manuals