EasyManua.ls Logo

Krone MX 310 GL - Operational Readiness

Krone MX 310 GL
244 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Comfort Control Unit
81
Pos: 21.5.5 /BA/ Info-Center/Lad ewagen/Einsc halten Bedien einheit Ladewage n @ 0\mod _120063906178 7_78.doc @ 45 929
9.6 Operational Readiness
Switching ON
Figure 46:
Press the key.
After switching the unit on, the connection to the job computer is established. If it is not possible
to set up a connection, data connection interrupted, the message shown on the right appears in
the display.
If the connection is established, the basic screen appears after a brief time (see Section
"Manual Mode").
Pos: 21.6 /BA/---- -Seitenumbruch-- ---- @ 0\ mod_1196175311 226_0.doc @ 4165

Table of Contents

Related product manuals