Operation
153
Pos: 25.7 /BA/Be dienung /La dewagen/Bei el ektromagnetisch er Medium_AX @ 2\mod_120 3579892111_ 78.doc @ 667 15
11.3 For electromagnetic medium operation
(GL design only)
When loading, proceed as follows:
• Set the pick-up switch to "Lower".
• Pressurise the hydraulic system.
• Pick up swath
Note
As soon as the first load column has reached about 3/4 the total loading
height, turn on the floor conveyor feed and move the floor conveyor (load
column) back by approx. 0.5 m. This will prevent the load column from tipping
over.
• For the subsequent loading process, switch on the floor conveyor once the loading height
has been reached or when the loading unit becomes unstable due to heavy loads. To do
this, switch the floor conveyor switch to "On".
• Keep the floor conveyor activation switch pressed until the load column has been
transported somewhat to the rear.
Pos: 25.8 /BA/---- -Seitenumbruch-- ---- @ 0\ mod_1196175311 226_0.doc @ 4165