Chapter 18 Dedicated XGR Function
18-10
j. Base Changing Wizard
Base can be changed easily by Base Changing Wizard while PLC is operating. Base Changing Wizard has 4 steps Selecting Base,
Removing Base, Installing New Base, and Changing Base Finished.
Notes
In XGR system, a part of expansion base can be exchanged according to configuration of expansion base.
1. Ring topology: All expansion bases can be exchanged.
2. Bus topology: In Bus topology, final expansion base is only changed.
[Steps]
1. Selects [Online] – [Base Changing Wizard].
2. In Selecting Base step, selects base for changing and click Next button.
[Dialog box]
[Description of dialog box]
a. Information: Information of Selecting Base step
b. Base module tree: It displays base module. Changeable base is displayed according to connection state of expansion base.
(
: Changeable base, : Non-changeable base )
c. List of module on slot: It displays the information of module on selected base.
d. Back: It is always inactive mode while selecting base step.
e. Next: Next step to Removing Base step. It is active mode when changeable base is selected.
f. Cancel: Cancel Base Changing Wizard execution.
Notes
If Base Changing Wizard execution is canceled, selected base is excluded from operation. Please check Fault Mask and I/O Skip.
a
b
c
d
e
f