2 Remove the bolt that secures the front cover (left side) (❶). Push and hold the latch on
the left side of the cover. Then remove the cover by lifting it from the bottom and
moving it away from the front of the inverter (❷).
3 Connect the cables to the power terminals and the control terminals. For cable
specifications, refer to 1.5 Cable Selection on page 13.