EasyManuals Logo

YASKAWA Sigma II Series User Manual

YASKAWA Sigma II Series
578 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #524 background imageLoading...
Page #524 background image
11.2 Inspection and Maintenance
11-19
11
Inspection, Maintenance, and Troubleshooting
11.2.3 SERVOPACK’s Parts Replacement Schedule
The following electric or electronic parts are subject to mechanical wear or deterioration over time. To avoid
failure, replace these parts at the frequency indicated.
Refer to the standard replacement period in the following table, contact your Yaskawa representative. After
an examination of the part in question, we will determine whether the parts should be replaced or not.
The parameters of any SERVOPACKs overhauled by Yaskawa are reset to the factory settings before ship-
ping. Be sure to confirm that the parameters are properly set before starting operation.
Table 11.8 Periodical Part Replacement
Part Standard Replacement
Period
Operating Conditions
Cooling Fan
4 to 5 years
• Surrounding Air Temperature: Annual average of
30°C
• Load Factor: 80% max.
• Operation Rate: 20 hours/day max.
Smoothing Capacitor
7 to 8 years
Relays
Fuses
10 years
Aluminum Electrolytic
Capacitor on Circuit Board
5 years

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the YASKAWA Sigma II Series and is the answer not in the manual?

YASKAWA Sigma II Series Specifications

General IconGeneral
BrandYASKAWA
ModelSigma II Series
CategoryController
LanguageEnglish

Related product manuals