RX200 S8
Upgrade and Maintenance Manual 157
Expansion cards and backup units
9.4.2 Installing an expansion card - slot 4
9.4.2.1 Preliminary steps
Ê "Disabling BitLocker functionality" on page 63
Ê "Disabling SVOM boot watchdog functionality" on page 64
Ê "Shutting down the server" on page 46
Ê "Disconnecting the server from the mains" on page 47
Ê "Getting access to the component" on page 47
Ê "Removing the riser module 3" on page 60
9.4.2.2 Installing the expansion card - slot 4
Ê Please read the documentation supplied with the expansion card.
Figure 91: Installing the expansion card - slot 4
Upgrade and Repair Unit
(URU)
Hardware: 10 minutes
Software: 5 minutes
Tools: tool-less
A