EasyManua.ls Logo

Fujitsu PRIMERGY RX200 S8 - Switching on the Server; Handling Riser Modules

Fujitsu PRIMERGY RX200 S8
336 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
58 Upgrade and Maintenance Manual
RX200 S8
Basic hardware procedures
4.7 Switching on the server
V CAUTION!
Before switching on the server, make sure the top cover is closed. In
order to comply with applicable EMC regulations (regulations on
electromagnetic compatibility) and satisfy cooling requirements, the
server must not run while the top cover is removed.
After connecting all power cords, wait at least 60 seconds before
pressing the On / Off button.
For further safety information, please refer to chapter "Important
information" on page 31.
I This step is only applicable to replace or expand non-hot plug
components.
Ê Press the On / Off button to start up the server.
Ê Ensure that the power-on indicator above the On / Off button is lit green.
Ê Perform the required procedures described in the concluding steps of each
upgrade or maintenance task.
4.8 Handling riser modules
Removing the riser module 1
Figure 13: Removing the riser module 1
Ê Carefully pull out the riser module 1 upward.

Table of Contents

Other manuals for Fujitsu PRIMERGY RX200 S8

Related product manuals