– Remove the desired processor as described in section "Removing a 
processor" on page 298.
– Install the new processor as described in section "Installing the processor" 
on page 287.
11.4.3 Concluding steps
Ê "Installing processor heat sinks" on page 307
Ê "Reassembling" on page 61
Ê "Connecting the server to the power source" on page 66
Ê If applicable, "Updating or recovering the system board BIOS and iRMC" on 
page 77
Ê If applicable, "Updating RAID controller firmware" on page 81
Ê "Switching on the server" on page 67
Ê "Enabling SVOM boot watchdog functionality" on page 86
Ê "Enabling BitLocker functionality" on page 92