EasyManua.ls Logo

Fujitsu PRIMERGY RX2540 M1 - Applying Thermal Paste; Installing the Processor Heat Sink; Concluding Steps

Fujitsu PRIMERGY RX2540 M1
438 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RX2540 M1
Upgrade and Maintenance Manual 313
Processors
11.5.4.2 Applying thermal paste
Ê Apply thermal paste to the processor surface as described in section
"Applying thermal paste" on page 314.
I If the processor upgrade or replacement kit contains a new CPU heat
sink, a thin layer of thermal compound has already been pre-applied
to its lower surface. In this case, please proceed with section
"Installing the heat sink" on page 310.
11.5.4.3 Installing the processor heat sink
Ê Install the processor heat sink as described in sections "Preparing the heat
sink and processor" on page 309 and "Installing the heat sink" on page 310.
11.5.5 Concluding steps
Ê "Reassembling" on page 61
Ê "Connecting the server to the power source" on page 66
Ê "Switching on the server" on page 67

Table of Contents

Other manuals for Fujitsu PRIMERGY RX2540 M1

Related product manuals