14.3.3.4 Concluding steps
Ê "Installing the air duct" on page 61
Ê "Mounting the housing cover" on page 62
Ê "Sliding the server into the rack" on page 65
If the server has been completely removed from the rack for maintenance 
purposes, reinstall and secure it in the rack as described in section 
"Mounting the server in the rack" on page 63.
Ê "Connecting the server to the power source" on page 66
Ê "Enabling SVOM boot watchdog functionality" on page 86
Ê "Enabling BitLocker functionality" on page 92
14.3.3.5 Software configuration
In order to setup the ESXi configuration, the VMware ESXi Recovery Tools CD 
is required. An ISO image of the CD is available from the Fujitsu service 
partners portal at the following https address:
https://globalpartners.ts.fujitsu.com/com/service/ps/Servers/PRIMERGY/
Pages/default.aspx.
Ê Sign in and choose your PRIMERGY server.
Ê Select the Software & Tools Documentation category.
Ê Download the desired ESXi Recovery CD ISO image, listed under Tools.
Ê Unpack and burn the image to a CD.
Ê Ensure that no other USB storage device is connected to the server beside 
the UFM.
Ê Insert the Recovery Tools CD into your CD / DVD drive and reboot the 
server.
The server should now boot from the Recovery Tools CD.
Ê Follow the on-screen instructions to initiate the installation.
After the flash process is complete, you will be asked to reboot the system.
I IFor the Japanese market, follow the instructions provided separately.