EasyManuals Logo

GE LOGIQ P9 Service Manual

GE LOGIQ P9
602 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #527 background imageLoading...
Page #527 background image
GEDRAFT LOGIQ P9/P7
D
IRECTION 5604324, REVISION 11 DRAFT (JANUARY 24, 2019) SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-201
12.) Unscrew 6 screws and carefully remove the OPIO base.
13.)Remove the IGUS THRUST BUSH.
CAUTION
When reassemble the ROTATION MODULE ASSY, HSH screw should be tightened proper
torque (60kgf-cm)
CAUTION
When reassemble the screws, please use SCREW HSH M5X16 NYLOK(5729013).
CAUTION
When reassemble the OPIO base, HSH screw should be tightened proper touque (60kgf-cm).
CAUTION
When reassemble the screws, please use SCREW HSH M5X16 NYOK (5729013).
CAUTION
DO NOT wipe out grease from part.
IGUS THRUST BUSH

Table of Contents

Other manuals for GE LOGIQ P9

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ P9 and is the answer not in the manual?

GE LOGIQ P9 Specifications

General IconGeneral
TypeUltrasound System
3D/4D ImagingYes
ElastographyYes
ConnectivityDICOM, USB, Ethernet, HDMI
Doppler ModesColor Doppler, Power Doppler
Probesconvex, linear, phased array
Imaging ModesM-Mode, Color Doppler, Power Doppler
PortabilityCart-based
ApplicationsVascular, Cardiac, OB/GYN, Musculoskeletal
WeightApprox. 80 kg
Touch Panel10.1-in touchscreen

Related product manuals