19 CC-LINK INSTRUCTIONS
19.7 Setting Network Parameters
1665
19
Processing details
This instruction sets the network parameters in the master station and starts up the data link.
This instruction can be executed only for the master station.
The following figure shows how the G(P).RLPASET instruction operates during execution.
The completion status of the G(P).RLPASET instruction can be checked with the completion device (d) and the completion
status indication device (d)+1.
The network parameters specified by (s1) to (s5) are written to the master station.
The data link is started up.
The device specified by (d) is turned on.
Completion device (d)
This device turns on during END processing of the scan where the G(P).RLPASET instruction completes, and turns off during the next END processing.
Completion status indication device (d)+1
This device turns on or off depending on the completion status of the G(P).RLPASET instruction.
When completed successfully: The device remains off.
When completed with an error: The device turns on during END processing of the scan where the G(P).RLPASET instruction completes, and turns off during the
next END processing.