EasyManua.ls Logo

Mitsubishi GOT2000 Series - Page 33

Mitsubishi GOT2000 Series
674 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1. PREPARATORY PROCEDURES FOR MONITORING
1.1 Setting the Communication Interface
1 - 9
1
PREPARATORY PROCEDURES FOR MONITORING
(3) Setting [I/F]
The interface differs depending on the GOT to be used.
Set the I/F according to the connection and the position of communication unit to be mounted onto the GOT.
3rd stage
2nd stage
1st stage
(Example: In the case of the GT27)
Extension interface
Standard interface 1
(RS-232 interface built in the GOT)
Standard interface 2
(USB interface built in the GOT)
Standard interface 3
(RS-422/485 interface built in the GOT)
Standard interface 4
(Ethernet interface built in the GOT)

Table of Contents

Other manuals for Mitsubishi GOT2000 Series

Related product manuals