12. CC-Link CONNECTION (INTELLIGENT DEVICE STATION)
12.4 PLC Side Setting
12 - 37
CC-Link CONNECTION (INTELLIGENT DEVICE STATION)
12
(d) Example of sequence program (FROM/TO instruction)
POINTPOINTPOINT
When changing the sequence program
After writing the sequence program to the PLC CPU, operate the PLC CPU ether turning OFF and then ON or resetting.
Data link
startup
normal
completion
(buffer memory)
Data link
startup
abnormal
completion
(buffer
memory)
Turn on only during 1 scan after RUN
Module
ready
Module error
Module
ready
Module error
Number of connected
modules (1 module)
Number of retry (3 times)
Number of automatic
return stations (1 station)
Reserved station
specification
(No specification)
Refresh instruction
Data link startup request
(buffer memory address)
Error code reading
(SW0068)
Error invalid station
specification
(No specification)
Station data (Intelligent
device station, exclusive
station 1, station No. 1)
Operation specification in
the case of CPU failure
(Stop)
* Parameter setting
* Refresh instruction
* Data link with buffer memory parameters

Table of Contents

Other manuals for Mitsubishi GOT2000 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mitsubishi GOT2000 Series and is the answer not in the manual?

Mitsubishi GOT2000 Series Specifications

General IconGeneral
Power Supply24VDC
SoftwareGT Works3
ProcessorRISC CPU
InterfaceEthernet, USB, RS-232, RS-422/485
Operating Temperature0°C to 50°C
Display TypeTFT LCD
Storage Temperature-20°C to 60°C
Humidity10% to 90% (non-condensing)
Shock Resistance147 m/s² (15G), 11ms duration
Touch PanelAnalog Resistive