EasyManua.ls Logo

Mitsubishi GOT2000 Series - Page 50

Mitsubishi GOT2000 Series
674 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1 - 26
1. PREPARATORY PROCEDURES FOR MONITORING
1.6 Checking for Normal Monitoring
Perform an I/O check
Whether the PLC can communicate with the GOT or not can be checked by the I/O check function.
If this check ends successfully, it means correct communication interface settings and proper cable connection.
Display the I/O check screen by Main Menu.
Display the I/O check screen by [Maintenance] [I/O check].
For details on the I/O check, refer to the following manual:
GOT2000 Series User's Manual (Utility)
1. Touch [CPU] on the I/O check screen.
Touching [CPU] executes the communication
check with the connected PLC.
2. When the communication screen ends
successfully, the screen on the left is displayed.
1.

Table of Contents

Other manuals for Mitsubishi GOT2000 Series

Related product manuals