EasyManuals Logo

Mitsubishi GOT2000 Series Connection Manual

Mitsubishi GOT2000 Series
674 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #52 background imageLoading...
Page #52 background image
1 - 28
1. PREPARATORY PROCEDURES FOR MONITORING
1.6 Checking for Normal Monitoring
(3) For CC-Link IE Field Network system
The communication status between the GOT and CC-Link IE Field Network can be confirmed by the utility
screen of the GOT.
For details on the operation method of the GOT Utility screen, refer to the following manual.
GOT2000 Series User's Manual (Utility)
(4) For CC-Link system
The communication status between the GOT and the CC-Link System can be confirmed by the Utility screen of
the GOT.
For details on the operation method of the GOT Utility screen, refer to the following manual.
GOT2000 Series User's Manual (Utility)

Table of Contents

Other manuals for Mitsubishi GOT2000 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mitsubishi GOT2000 Series and is the answer not in the manual?

Mitsubishi GOT2000 Series Specifications

General IconGeneral
Power Supply24VDC
SoftwareGT Works3
ProcessorRISC CPU
InterfaceEthernet, USB, RS-232, RS-422/485
Operating Temperature0°C to 50°C
Display TypeTFT LCD
Storage Temperature-20°C to 60°C
Humidity10% to 90% (non-condensing)
Shock Resistance147 m/s² (15G), 11ms duration
Touch PanelAnalog Resistive

Related product manuals