4 First Commissioning
For the first commissioning you should acquaint yourself with the following steps and
the described functions:
− Installation of the Module
− Check and set Terminating resistor
− Setting of the Baudrate
− Setting of the node Address
− Select the device control Local/Remote 412
− Commission the device function via PLC
o Reaction of the PLC to the Boot-Up message
or Guarding-Request/Response
12.2.20,
12.2.21,
12.2.17,
− Setting Reference value:
o Speed setting in speed controlled configura-
tion x10, x11, x15, x16, x30, x60
o Reference value in Positioning configuration
x40
Interpolated Position Mode
Table Travel record Mode
04/13 CM-CAN ACU 23