EasyManua.ls Logo

ESAB CROSSBOW - Monthly Maintenance

ESAB CROSSBOW
232 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ESAB Cutting Systems
CROSSBOW Page 134
5.1.3 Monthly Maintenance
1) Check air supply filter to ensure it is clean and free of oil and moisture.
2) Check that all the valves and motors work normally.
3) Inspect gas piping, fittings, and hoses for leaks or damage.
4) Check hose fittings to ensure they are tight, free from leaks or damage.
5) Check all screws on the machine are installed, tight, and free of accumulated slag or rust.
6) Perform functional test of all buttons and switches, replace if necessary.
7) Check all cable plugs and sockets on the rear of the unit, inspect for wear or damage.
8) Check all electrical cables and connections.
9) Check the machine’s power cable for wear or damage. Replace if necessary.
10) Inspect drive rack and pinions on each axis. Replace any showing visible wear or teeth
deformation.
11) Check all gas valve fittings and hoses for leaks. Repair or replace as required. Use soapy
water to check connectors for leaks.

Table of Contents

Related product manuals