▶
"Connecting the power cord" on page 82
.
▶
"Switching on the server" on page 83.
▶
"Resuming BitLocker functionality" on page 130.
10.5 Replacing memory modules
Upgrade and Repair Unit
(URU)
Hardware: 5 minutes
Tools: tool-less
CAUTION
▶
Use only released configurations to ensure a faultless operation of
the system.
▶
Before changing the memory configuration, verify if the
configuration is released. Please contact your sales outlet or our
customer service center.
Preliminary steps
▶
"Locating the defective server" on page 47
.
▶
"Suspending BitLocker functionality" on page 107.
▶
"Shutting down the server" on page 49.
▶
"Disconnecting the power cord" on page 50.
▶
"Getting access to the component" on page 51.
▶
"Removing the system air duct" on page 67.
▶
"Locating the defective component" on page 48.
Removing the defective memory module
▶
Remove the memory module, see "Removing a memory module" on
page 404.
Main memory
TX2550 M5 Upgrade and Maintenance Manual 405