EasyManua.ls Logo

Mitsubishi Electric MELSEC iQ-R Series - Page 1398

Mitsubishi Electric MELSEC iQ-R Series
2110 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1396
11 PROCESS CONTROL INSTRUCTIONS
11.7 Auto Tuning
Local work memory
The system uses this area as a work area.
To start the control from the initial status, clear data by using a sequence program.
*1 The sampling period counter, timeout time counter, and timeout (after maximum ramp) counter are each rounded off to the nearest
whole number.
Execution cycle (T)
Set the execution cycle (T) in SD816 and SD817 in single-precision real number.
Operand: (d3)
Device Symbol Name Recommended range Data type Standard
value
Set by
+0 Sampling period counter initialization
completion flag
System
+1 Sampling period counter
*1
+2 Timeout time counter initialization
completion flag
+3 Timeout time counter
*1
+4 Timeout time (after maximum ramp)
counter initialization completion flag
+5 Timeout time (after maximum ramp)
counter
*1
+6 Step manipulated value set completion flag
+7 Auto tuning counter
+8
+9
Auto tuning start PV0
+10
+11
PV
n-1
Last process value
+12
+13
Maximum ramp value
+14
+15
Counter at maximum ramp
+16
+17
PV at maximum ramp
+18
+19
R Response speed
+20
+21
L Equivalent dead time

Table of Contents

Other manuals for Mitsubishi Electric MELSEC iQ-R Series

Related product manuals