Chapter 2—Installing the Library Installing the Library
August 2017 User Guide—Spectra T50e Library
51
4. Placethelibraryonasolid,levelsurfaceinalocationwithgoodairflow
fromthefrontofthelibrarytotheback.
Remove the Shipping Lock
Theshippinglock,whichpreventstheroboticsfrommovingduring
shipmentandinstallation,mustberemovedbeforethelibraryispowered
on.Theshippinglockislocatedinthetopcenterofthelibraryandisheld
inplacewithasmalllabel.
1. Removethetapelabelholdingthelockinplace,thenremovethelock.
2. Replacethelabelovertheopening.
3. Slidethelockintothestorageslotonthebackofthelibrary.
Note: Youneedtoreinstalltheshippinglockifyoumoveorshipthe
library.
4. Youarenowreadytoinstallthedrives.
Make sure that all six feet are firmly in contact with the surface and that the top of
the library is level.
Failure to remove the shipping lock before powering on the library can cause
damage to the library.
Unless you are not able to access the top of the library when it is installed in a rack,
do not remove the shipping lock until after you complete the installation.
Figure 14 The shipping lock must be removed before powering on the library.
1. Remove the label.
2. Remove the lock.
3. Replace the label.
4. Store the lock.