INSTALLATION
Chapter 3
............
Sievers TOC-R3 Operation and Maintenance Manual
DLM 95000-01 EN Rev. A 87 © Veolia 2023
Important! Allow the Analyzer to run for at least two hours before continuing to the next step.
The Furnace must heat up to temperature (1200 °C, 2192 °F) and be allowed to burn off any
internal manufacturing residues.
Caution! Very Hot temperatures! Do not touch the Furnace, Furnace Head Assembly, or
Furnace Foot Assembly without proper PPE.
After two hours, connect the loose end of the Transfer Tube to the Gas Cooler Unit. See Figure 3-
20 on page 88. Ensure to use proper PPE while working inside the Analyzer. The Analyzer
system is now closed. Close the Analyzer door.
Warning
The area near the center of the electric furnace becomes extremely hot
when the furnace is heating up and when the furnace has reached
operating temperature (1200 °C, 2192 °F). Do not touch the electric furnace
as this could result in burns. Allow the furnace to cool before performing
any maintenance on the combustion Furnace.