Interactive SourceMeter® Instrument Reference Manual Section 7:
Introduction to TSP operation
2450-901-01 Rev. B/September 2013 7-33
2. The Select Instrument dialog box opens. Select an existing instrument from the list, or type the
VISA resource ID of the instrument in the Select or enter new instrument box.
Figure 128: Select Instrument dialog box
3. Click OK. You briefly see the Opening Resource dialog box, and then the instrument is visible in
the Instrument Console.
Figure 129: Instrument connected in TSB
Creating a new TSP project
To create a new Test Script Processor (TSP
®
) project:
1. On the File menu in the TSP perspective, select New > TSP Project. The New TSP Project
dialog box opens.
Figure 130: New TSP Project dialog box