2.Installation
141
2. Remove the two screws from the upper cover [A].
• The screw [B] is a sems screw. The screw [C] is a tapping screw. Be careful do not use
the wrong screws when installing the upper cover.
3. Remove the screw from the rear side of the upper cover [A].
4. Lift the upper cover [A] by releasing the two hooks, and then put it on the mainframe so that you
can access the bracket [B] on the right side of the machine.