EasyManuals Logo

Ecolab EcoPro User Manual

Ecolab EcoPro
Go to English
550 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #147 background imageLoading...
Page #147 background image
9.3 Replace the suction / pressure valve and metering cartridge
Fig. 20: Replace the suction / pressure valve and metering cartridge
1 O-ring, hose connection, pressure side
2 Pressure valve
3 O-ring: Pump head pressure valve
4 V3 metering cartridge
5 O-ring: Pump head suction valve
6 Suction valve
7 O-ring, hose connection, suction-side
1. Remove suction and pressure valve using an open spanner
.
2. Mount all O-rings.
3. Fit metering cartridges (for pump head with 5 l/h)
(valve model V3)
4. Screw in the new suction and pressure valves in the correct position (tightening
torque of 2-3 Nm).
NOTICE!
T
ightening torques of the suction and pressure valves:
See
Ä
Chapter 9.4 ‘Installing the dosing valve in the correct position’
on page 56
Maintenance
55 417102264 Rev. 5-01.2019

Table of Contents

Other manuals for Ecolab EcoPro

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ecolab EcoPro and is the answer not in the manual?

Ecolab EcoPro Specifications

General IconGeneral
BrandEcolab
ModelEcoPro
CategoryWater Pump
LanguageEnglish

Related product manuals