EasyManua.ls Logo

Lucent Technologies 5ESS - Page 266

Lucent Technologies 5ESS
552 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
............................................................................................................................................................
2
If there are two PHE2s in the processor group, read RC/V 33.4 for the
other channel group, to make sure identical IP interface data was
automatically inserted for it.
............................................................................................................................................................
3
On RC/V 33.3, provision the IP gateway between an external IP
destination and a local IP interface.
Reference:
“Insert IP Routing (RC/V 33.3)” (5-44)
............................................................................................................................................................
4
On RC/V 33.17, use the new IP interface name and each adjacent
router IP address to insert IP ping parameters from the endpoint to the
router(s).
Reference:
“Insert Router Pinging (RC/V 33.17)” (5-47)
............................................................................................................................................................
5
Use EXC:PING, OP:TCPIP:ARPDMP, and OP:TCPIP:RTDMP to
verify reachability of the adjacent IP router from new Ethernet IP
interface.
............................................................................................................................................................
6
Examine the SCTPPARM/5885 office records and select an
appropriate SCTP endpoint parameter set, or do a change/insert
operation on RC/V 33.18 for an existing parameter set to add a new
parameter set.
............................................................................................................................................................
7
On RC/V 33.19, insert the new SCTP Near Endpoint, using the
selected processor group and SCTP parameter set.
Reference:
“Insert SCTP Near Endpoints (RC/V 33.19)” (5-56)
............................................................................................................................................................
8
Type and enter the backup command .
BKUP:ODD;
Result:
BKUP ODD COMPLETED
Add New SCTP Near Endpoint
Provisioning
....................................................................................................................................................................................................................................
5-100
Lucent Technologies 235-200-118
Issue 3.02B, March 2007

Table of Contents

Related product manuals