Select and Prepare Terminal
....................................................................................................................................................................................................................................
Purpose
This procedure contains instructions for selecting and preparing a
terminal for RC/V activities.
When to use
This procedure is executed before any RC/V activities.
Related information
Refer to 235-118-251, Recent Change Procedures, for information on
the RC/V system.
Admonishments
None.
Before you begin
Required Tools
• Supplemental Trunk Line Workstation (STLWS), or
• Recent Change and Verify (RC/V) terminal
Required Material
• The 5ESS
®
switch must be running a 5E16.2 FR3 or later
software release.
Required Information
• No information is required.
Required Conditions
• No conditions are required.
Procedure for STLWS
terminal
............................................................................................................................................................
1
Locate a STLWS. Verify the workstation is in command mode then
type and enter at the CMD prompt:
196
Result:
RECENT CHANGE AND VERIFY view is displayed and cursor
is located at PRINT OPTION.
............................................................................................................................................................
2
Enable the print option.
Y
Provisioning
....................................................................................................................................................................................................................................
235-200-118
Issue 3.02B, March 2007
Lucent Technologies
5-11