Add New Association Set to Another Office
....................................................................................................................................................................................................................................
Purpose
This procedure contains the steps for adding a new association set to
another office.
When to use
Use this procedure to add a new association set to another office.
Related information
Refer to 235-118-258, Recent Change Reference, for information on
the RC/V system.
Refer to 235-080-100, Translations Guide, for information on Office
Records (output reports).
Refer to the 235-600-700/750, Input/Output Messages manuals for
additional information on the Input and Output commands.
Admonishments
None.
Before you begin
Required Tools
• Supplemental Trunk Line Workstation (STLWS) or Recent
Change and Verify (RC/V) terminal
• Access to RC/V Menu Interface
Required Material
• The 5ESS
®
switch must be running a 5E16.2 FR3 software
release with the SIP for Packet Trunking - NAR feature software.
Required Information
• None
Required Conditions
• None
Procedure
............................................................................................................................................................
1
Examine the SCTPASSC/5889 office records to identify the
associations to be used in the new association set, or execute the
procedure “Add New Association Set to Another Office” (5-105) for
each association that will connect an SCTP near endpoint in the
5ESS
®
switch to an SCTP far endpoint in the other office.
Provisioning
....................................................................................................................................................................................................................................
235-200-118
Issue 3.02B, March 2007
Lucent Technologies
5-105