Initiate Delay Test Call
....................................................................................................................................................................................................................................
Purpose
This procedure requests a delay test to a far-end loopback point over
the packet network for a SIP call. Note: This is only supported for
SCTP.
When to use
According to local practices for routine maintenance, use this
procedure to verify loopback, delay, power and noise levels of a
connection for a SIP call.
Related information
Refer to the Input Messages Manual, 235-600-700 and the Output
Messages Manual, 235-600-750, for additional information. Since
there are no CICs involved in SIP signaling, only option, PKTG is
allowed and not PKTGMN.
Admonishments
None
Before you begin
Required Tools
• Use of Master Control center (MCC) or Supplementary Trunk
Line Workstation (STLWS).
Required Material
• The switch must be running a 5E16.2 FR3 software release or
later with the SIP for Packet Trunking feature software.
Required Information
• Office Record 5219 for PKTG
• OPDN
Required Conditions
• None required.
Procedure
............................................................................................................................................................
1
Request a delay test on a loopback testline:
TST:PATH,DELAY,PKTG=f,OPDN=d;
Where:
d = Loopback testline
f = Packet group
Maintenance Considerations
....................................................................................................................................................................................................................................
7-24
Lucent Technologies 235-200-118
Issue 3.02B, March 2007