EasyManua.ls Logo

Lucent Technologies 5ESS - Deprovisioning Sequence

Lucent Technologies 5ESS
552 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Deprovisioning Sequence
....................................................................................................................................................................................................................................
Introduction
This section contains the procedures for deprovisioning the SM
connectivity and signaling. Figure 6-1, “Deprovisioning Flowchart”
(6-4) contains a flowchart that indicates the order the RC/V views are
executed and the “Deprovisioning Sequence” (6-5) contains steps with
more details for deprovisioning the SIP application.
Note:The SM connectivity deprovisioning does not apply on
DRM/VCDX.
Refer to 235-105-331, Hardware Change Procedures - Degrowth for
information on OIU-IP degrowth procedures to delete IP bearer, if IP
packet trunking is no longer to be used.
Deprovisioning
....................................................................................................................................................................................................................................
235-200-118
Issue 3.02B, March 2007
Lucent Technologies
6-3

Table of Contents

Related product manuals