6 Deprovisioning
Overview
....................................................................................................................................................................................................................................
Purpose
This chapter contains the procedures for deprovisioning the Session
Initiation Protocol application in the 5ESS
®
switch.
The 5ESS
®
switch Recent Change and Verify (RC/V) interface
provides access to the database through views of the Office
Dependent Data (ODD). Only those views and steps necessary to
deprovision SIP are covered in this chapter. For complete descriptions
of RC/V views or more information about recent change and verify,
refer to 235-118-258, Recent Change Reference, and 235-118-251,
Recent Change Procedures.
The Deprovisioning section does not include the procedures for
deprovisioning traffic measurements. This can be found in
235-070-100, Administration and Engineering Guidelines.
Additionally, this section does not include procedures to degrow
hardware. Refer to 235-105-331, Hardware Change Procedures -
Degrowth for information on degrowth of the PHE2 and PH33
hardware.
All deprovisioning procedures described in this section are performed
using RC/V menu mode.
The RC/V menu mode can be entered from the RC/V terminal or a
Supplemental Trunk Line Workstation (STLWS).
....................................................................................................................................................................................................................................
235-200-118
Issue 3.02B, March 2007
Lucent Technologies
6-1