If the identified PHE2 is not OOS, remove it from service.
RMV:PSUPH=a-b-c-d;
Where:
a = Global switch module number
b = Packet switch unit 2 number
c = PSU2 shelf number
d = PHE2 number
............................................................................................................................................................
3
At the PSU2 shelf, remove the corresponding LLE2 paddleboard.
............................................................................................................................................................
4
Insert another LLE2 paddleboard in place of the removed
paddleboard.
............................................................................................................................................................
5
Restore the PHE2 associated with the replace LLE2 paddleboard.
RST:PSUPH=a-b-c-d;
Where:
a = Global switch module number
b = Packet switch unit 2 number
c = PSU2 shelf number
d = PHE2 number
Result:
Verify diagnostic phase 4 which tests the LLE2 paddleboard is
All Tests Passed (ATP). Check results and take appropriate
action:
• If diagnostics pass and the PHE2 restoral succeeds, then
EXIT this procedure.
• If diagnostics fail at phase 4, repeat this procedure with
another LLE2 paddleboard.
• If diagnostics pass but the PHE2 restoral fails, refer to the
Output Messages Manual, 235-600-750, for additional
information.