f = Service selection state for the processor identified
g = Reason for the service selection change
............................................................................................................................................................
2
If the REPT SERV PCRGRP change report is generated without errors,
then make note of the change and EXIT this procedure. Otherwise,
CONTINUE with this procedure.
............................................................................................................................................................
3
Check the reason for the change and take appropriate action:
• If the reason for the service selection change is AUTO RMV,
then refer to the SIP for Packet Trunking Corrective Maintenance
procedure, Resolve PH Problems, 235-200-118.
• If the reason for the service selection change is
ELNK DOWN, then
determine the cause of the Ethernet link going down, e.g. loose
or faulty cable, and repair it, if possible. A corresponding
REPT
ELNK report should have been generated.
However, it is possible that the LLE2 paddleboard is faulty. Refer
to the SIP for Packet Trunking Corrective Maintenance
procedure, Resolve LLE2 Paddleboard problems, 235-200-118.
If the service selection change report is generated with preceding
asterisks, then this is a major alarm indicating that a SIP PH
transitioned from serving to unavailable.
This alarmed report usually indicates that the PHE2 is OOS, the
corresponding LLE2 paddleboard is faulty or the Ethernet link is
down. Refer to the SIP for Packet Trunking Corrective Maintenance
procedure, Resolve PH Problems, 235-200-118.
If the service selection change report is generated with a preceding
“*C”, then this is a critical alarm indicating that a SIP PH transitioned
from serving to unavailable and the other SIP PH in the processor
group is unavailable or unequipped.
This alarmed report usually indicates that the PHE2 is
OOS, the
corresponding LLE2 paddleboard is faulty or the Ethernet link is
down. Refer to the SIP for Packet Trunking Corrective Maintenance
procedure, Resolve PH problems, 235-200-118.
............................................................................................................................................................
4
Stop. You have completed this procedure.
Analyze Service Selection Change Report
Maintenance Considerations
....................................................................................................................................................................................................................................
7-86
Lucent Technologies 235-200-118
Issue 3.02B, March 2007
E ND OF S TEPS
.........................................................................................................................................................................................................................................................