8. Mount rack nuts fixing the server to the rack at four positions circled in red shown below
(image of mounting the server to rack).
9. Remove the server from the box carefully and place it on a flat surface gently.
3U
2U
1U
4U
5U
6U
7U
端から3U目と7U目の中
に位置するように取り付けます
3U
2U
1U
4U
5U
6U
7U
端から3U目と7U目の中
に位置するように取り付けます
IMPORTANT:
Mount all rail assemblies before mounting servers when multiple
servers are mounted.
Mount rack nuts to be positioned in the center of
the 3
rd
U and the 7
th
U from the punch mark of
the rack on the lower side of the server.
NOTE:
There are two types of rack nuts for the square hole and round
hole of the rack.