EasyManua.ls Logo

NEC Express 5800 - CPU Test

NEC Express 5800
719 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation and Maintenance
663
CPU Test
(1) Outline
Cache Test
This test writes and reads memory for the test area, and the results are compared.
Floating point arithmetic test
This test executes floating point arithmetic instruction.
(2) Message
1. Standard message
Message Content
Start CPU test. (thread : xxx
cache size : yyy)
Test is started.
“xxx” is the number of threads. “yyy is the
cache size.
Successfully completed the CPU test. Test ended normally.
Halted the CPU test due to requests. CPU test is stopped by halt requests.
2. Error message
Message Content
Terminated CPU Cache test due to errors.
Failing Address Good Bad CPU Number
------------------- ------ ----- ----------------
xxx yyy zzz aaa
Error is detected on the cache test.
Error address, expected value, result value and
CPU number are displayed.
Terminated Floating Point Arithmetic Test
due to error.
compare failed.
CPU Number : xxxxx
Good : yyyyy
Bad : zzzzz
Error is detected on the floating point arithmetic
test.
CPU number, expected value file and result
value file are displayed.

Table of Contents

Other manuals for NEC Express 5800

Related product manuals