EasyManua.ls Logo

NEC Express 5800 - Power Control

NEC Express 5800
719 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
559
2 Power Control
You can perform power control of the host system by the following operations.
Power ON
Forced Power OFF(Power OFF immediate)
OS Shutdown(Soft Shutdown)
Hard Reset
Force Dump
Power Cycle
IMPORTANT:
If operating system is already running, these operation may
cause the loss of data in the host system.
NOTE:
The user must have an account which has the operator or
administrator privilege level to do these operations.
IMPORTANT:
Followings are about parameters used in operation image.
To run power management service for the Server1, please
specify the IP Address of Server Web Console(Server1) to the
“IP_ADDRESS”, and specify user account and password for
login to server web console to the “USERNAME/PASSWORD”.
As for user account and password, see “2.6 User Management”
in the web console section.

Table of Contents

Other manuals for NEC Express 5800

Related product manuals