EasyManua.ls Logo

NEC Express 5800 - Page 149

NEC Express 5800
719 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Hardware
149
29. Please verify the tention on all the cables and make sure they never stressed in any
cases as below
(1)Confirm the cables when they are streched
(2) Confirm the cables when they are folded
Check cable tention
Check cable tention
IMPORTANT:
Please watch both the direction of drawing chassis and cable tention. Please
STOP drawing or pushing chassis when you see any stress on any cables and
start over plugging cables.

Table of Contents

Other manuals for NEC Express 5800

Related product manuals