EasyManua.ls Logo

Techman Robot TM Palletizing Operator - Page 166

Default Icon
176 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TM Palletizing Operator User’s Manual Product Version: 1.0 / Document Version: 1.0 166
Situation: Robot detects abnormal air pressure on the tool when grapping the box.
Reset Procedure: Check box drop situation and stop the project. Then restart the project when it is ready.
4. “Air source pressure too low! cause PAUSE”
Situation: Air pressure is abnormal.
Reset Procedure: Check incoming air pressure value. Then, press “Start” to continue.
5. “Grab fail cause pause! Resume after checking”
Situation: The robot failed to grab box on the conveyor
Reset Procedure: Check sensor signal on the conveyor. Then, press “Start” to continue.
6. “Project initial with box on tool, cause pause”
Situation: Project starts with box on robot tool. User has to remove the box on gripper.
Reset Procedure:
Press “Stop” to stop the project.
Remove the box from the gripper.
Place the box in the picking position.
Press “Start” to start the project again.

Table of Contents

Related product manuals