RJ-45 cable and RJ-45 to DB-9 serial port adapter (provided).
•
Management host, such as a PC laptop, with a serial port (not provided).
Optional equipment: grounding cable kit with bracket, lug, and two screws and washers.
CAUTION: All QFX5110 switches require two people for installation, one person to
lift the switch into place and another person to attach the switch to the rack. If you
are installing the QFX5110 above 60 in. (152.4 cm) from the floor, you can remove
the power supplies and fan modules to minimize the weight before attempting to install
the switch.
CAUTION: If you are mounting multiple switches on a rack, mount the switch in the
lowest position of the rack first. Proceed to mount the rest of the switches from the
bottom to the top of the rack to minimize the risk of the rack toppling.