EasyManua.ls Logo

Juniper QFX5110 Series - Site Preparation Checklist for a QFX3600 or QFX3600-I Device

Juniper QFX5110 Series
669 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table 13: Site Preparation Checklist (continued)
DatePerformed ByFor More InformationItem or Task
Secure the rack or cabinet to the floor
and building structure.
Cables
Port Panel of a QFX5100-24Q
Device on page 32
Port Panel of a QFX5100-24Q-AA
Device
Port Panel of QFX5100-48S and
QFX5100-48SH Devices on
page 36
Port Panel of QFX5100-48T and
QFX5100-48TH Devices on
page 39
Port Panel of a QFX5100-96S
Device on page 41
Acquire cables and connectors:
Determine the number of cables
needed based on your planned
configuration.
Review the maximum distance allowed
for each cable. Choose the length of
cable based on the distance between
the hardware components being
connected.
Plan the cable routing and management.
RELATED DOCUMENTATION
General Safety Guidelines and Warnings | 203
General Site Guidelines
QFX5100 Standalone Installation Overview | 276
Mount a QFX5100 Device in a Rack or Cabinet | 279
Site Preparation Checklist for a QFX3600 or QFX3600-I Device
The checklist in Table 13 on page 92 summarizes the tasks you need to perform when preparing a site for
QFX3600 or QFX3600-I device installation.
93

Table of Contents

Related product manuals