EasyManuals Logo

Lucent Technologies 5ESS User Manual

Lucent Technologies 5ESS
552 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #269 background imageLoading...
Page #269 background image
............................................................................................................................................................
2
Examine the ASSCPARM/5887 office records and select an
appropriate SCTP association parameter set, or do a change/insert
operation on RC/V 33.20 for an existing parameter set to add a new
parameter set.
............................................................................................................................................................
3
If the association is to be added to an SCTP Far Endpoint that is
already associated with other SCTP Near Endpoints in the 5ESS
®
switch, proceed to step 4.
Otherwise:
Obtain the IP addresses and SCTP port of the new far endpoint,
and use OP:TCPIP:RTDMP and/or examine the IPROUT/5989
office records to verify whether the necessary IP route(s) exist to
the far IP address(es) from the near IP interface.
If the required IP route(s) do not exist, use RC/V 33.3 to insert
them. Refer to the “Insert IP Routing (RC/V 33.3)” (5-44)
procedure.
Use EXC:PING and OP:TCPIP:RTDMP to verify the reachability
of the new IP addresses from the near IP interface.
On RC/V 33.21, insert the new SCTP far endpoint. Refer to the
“Insert SCTP Far Endpoints (RC/V 33.21)” (5-59) procedure.
............................................................................................................................................................
4
Examine the SCTPASSC/5889 office records to select an unused
association number.
............................................................................................................................................................
5
On RC/V 33.22, use the selected association number to insert the
association, with the selected near endpoint, far endpoint, and
association parameter set.
If this was the first association on an SCTP near endpoint that
was in the GROW state, there should be an autonomous report
that the endpoint has transitioned from GROW to NOSERV.
If this was not the first association, there may be a report that the
endpoint has transitioned from INSERV to PARTSERV, if all the
previously-existing associations are ESTABLISHED.
............................................................................................................................................................
6
At the MCC or TLWS type and enter the backup command.
Add New SCTP Association to Connect to a
SCTP Far Endpoint
Provisioning
....................................................................................................................................................................................................................................
235-200-118
Issue 3.02B, March 2007
Lucent Technologies
5-103

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lucent Technologies 5ESS and is the answer not in the manual?

Lucent Technologies 5ESS Specifications

General IconGeneral
BrandLucent Technologies
Model5ESS
CategorySwitch
LanguageEnglish

Related product manuals