Update All PHE2 & PH33 Channel Group Assignments (RC/V
22.16)
....................................................................................................................................................................................................................................
Purpose
The PSU2 Protocol Handler Channel Group Assignments view (22.16)
defines channel groups for protocol handlers equipped on a shelf. A
channel group is a logical identifier for a protocol handler.
When to use
Use this procedure to unassign channel groups from PHE2 and PH33
hardware types.
Related information
Refer to 235-118-258, Recent Change Reference, for information on
the RC/V system.
Refer to the 235-600-700/750, Input/Output Messages manuals for
additional information on the Input and Output commands.
Admonishments
None.
Before you begin
Required Tools
• Supplemental Trunk Line Workstation (STLWS) or Recent
Change and Verify (RC/V) terminal
• Access to RC/V Menu Interface
Required Material
• The 5ESS
®
switch must be running a 5E16.2 FR3 software
release or later with the SIP for Packet Trunking - NAR feature
software.
• None
Required Information
• None
Required Conditions
• All SIP-T processor groups have been deleted on RC/V 33.16
• All IP processors that were used for SIP PHs have been deleted
on RC/V 33.1
• All GQPHs have been deleted on RC/V 17.24
NOTE: This is not needed for DRM/VCDX environment.
• The CRIT PSU (critical PSU2) must be set to N on RC/V 22.2.
Deprovisioning
....................................................................................................................................................................................................................................
235-200-118
Issue 3.02B, March 2007
Lucent Technologies
6-75