EasyManua.ls Logo

Matrix PRASAR UCS - License Activation for Customers

Matrix PRASAR UCS
1368 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Matrix PRASAR UCS System Manual 29
CHAPTER 3
Installing SPARK200
Before You Start
Before you begin the installation of the SPARK200, make sure that the required wiring has been done and you
have the following items ready:
PRASAR UCS Application License.
Appropriate cables and connectors to set up and test the WAN interface of the system and the LAN
connection.
A standalone PC or a PC connected in LAN.
A SIP Account to test VoIP connectivity.
One or more IP Phones for testing.
Well begun is half done; plan your hardware installation well.
Selecting the Installation Site for the system
The system maybe be rack mounted or mounted on a table. Refer to the mechanical dimensions of the model you
have, when selecting the site for installation, and deciding whether to mount the system on a table top or on a rack.
Select an appropriate site to install the system taking into consideration the following recommendations and
precautions:
The site of installation should be well-ventilated, moisture and dust free, and not exposed to direct sunlight,
heat, excessive cold or humidity.
The site should be equidistant from all the extensions to simplify cabling network and reduce cabling costs.
The system should be installed at a height of at least 3.5 feet from the ground. Installation at this height
makes preventive or corrective maintenance tasks easy.
The system should be installed away from any source of electromagnetic noise such as any radio
equipment, heavy transformers, faulty electric chokes of tube-lights, any device having faulty coil, etc.
Read “Protecting the System and Yourself”.

Table of Contents

Other manuals for Matrix PRASAR UCS