9.2.1.4 Connecting cables to the expansion card
Ê If applicable, connect internal cables to the expansion card.
I For a complete cabling overview, please refer to section "Cabling" on
page 319.
9.2.1.5 Concluding steps
Perform the following procedures to complete the task:
Ê Close the server cover as described in section "Closing the server" on
page 64.
Ê If applicable, connect external cables to the expansion card.
Ê Reconnect the AC power cord to the power supply unit.
Ê After installing or replacing a Modular RAID controller, update the firmware
as described in section "Updating RAID controller firmware" on page 87.
Ê In order to configure an expansion card that has been installed or replaced,
the card’s Option ROM has to be enabled in the system board BIOS. If
applicable, proceed as described in section "Enabling Option ROM scan" on
page 88.
Ê Enable boot watchdog functionality as described in section "Enabling SVOM
boot watchdog functionality" on page 92.
Ê If BitLocker functionality is used and has been disabled before starting the
maintenance task, re-enable BitLocker as described in section "Enabling
BitLocker functionality" on page 99.
Ê If applicable, restore LAN teaming configurations as described in section
"After replacing / upgrading LAN controllers" on page 103.